By Richard on Monday, 21 December 2020
Category: Case Studies

QE Logistics

We had a phone call from QE Logistics requiring their pallet racking and drive in racking to be removed from their warehouse in West Thurrock, we ended up doing this job over 3 days as you can imagine this time of year everything was completely full of stock. We storred all the pallets into the drive in racking so we could dismantle and make ready for tranport. Then we unloaded the drive in and took that down ready for transport.