We are gearing up for an exciting week ahead at Doncaster!

Unit 6 & 7 have already been dismantled and are ready for delivery, while Unit 10 & 11 will be prepared over the next 3 weeks. Stay tuned for more updates on the progress of the large Distribution Centre project.

#Doncaster #DistributionCentre #ConstructionUpdates 🏗️

Unit 6 = Link 51 Pallet Racking
7000mm x 900mm frame = 221
2700mm x 95mm x 50mm beam = 1361
3900mm x 150mm x 50mm tunnel beam = 22
 
Unit 7 = Dexion Speedlock Pallet Racking
8000mm x 900mm frame = 176
6000mm x 900mm frame = 129
2700mm x 90mm x 50mm beam = 1116
3900mm x 150mm x 50mm beam = 40
1350m x 90mm x 50mm beam = 60

Unit 10 = Apex Pallet Racking
7400mm x 90mm frame = 144
6000mm x 900mm frame = 66
5200mm x 900mm frame = 23
2700mm x 900mm x 50mm beam = 1040

Unit 11 = Link 51 Pallet racking
9000mm x 900mm frame = 177
7400mm x 900mm frame = 177
5000mm x 900mm frame = 52
2620mm x 90mm x 50mm beam = 2064
2700mm x 90mm x 50mm beam = 1008

Unit 11 = Dexion Speedlock Pallet Racking
6000mm x 930mm frame = 406
4000mm x 930mm frame = 34
2650mm x 90mm x 50mm beam = 2827